What a Berth in Whittier Costs
The harbour's published fees added up for your own boat — moorage, launching, parking, power and the tunnel toll, with the tax as its own line.
Loading the latest information…
The harbour's published fees added up for your own boat — moorage, launching, parking, power and the tunnel toll, with the tax as its own line.
Loading the latest information…
Whittier's harbour is run by the city, and every fee it charges is published. They are just published in four different places — a fee schedule, a moorage agreement, a wait-list application and the harbour page — so most people find out what a season costs when the bills arrive.
Put your boat's length in and this adds the published rates up, line by line, so you can check each one against the city's own schedule.
These are the published rates
Every figure on this page is copied from the fee schedule named at the bottom. Rates are set by the harbour’s own authority and can change.
The city's fee schedule prints no effective date and no ordinance number — its "2025 RATE" and "2026 RATE" column headings are the only dating it carries. The rates below are the 2026 column. The city's own moorage agreement says rates are set by ordinance and can change, so check with the harbour office before you count on a figure.
Put in your boat’s length, then how you’ll use the harbour. Every line shows its own arithmetic, so you can check it against the published rates below.
Moorage, dry storage and the grid are all charged per foot of overall length. Slips go up to 60 ft.
Pick the one that matches how you actually use the harbour. Reserved moorage is billed for the calendar year, not prorated by season.
Jan 1 – Dec 31. This is the permanent-berth product, and it is the one with a wait list.
Oct 1 – Mar 31, charged once for the whole season.
For a boat you trailer in rather than berth. The ramp fee is per round trip.
Daily rates run midnight to midnight, paid at the kiosk or the Passport app. Trailers are a separate rate — and see the notice below about summer.
Only if you use shore power at the small-boat harbour. The DeLong Dock is a different, higher tariff.
Charged only when the service is actually used.
The Anton Anderson tunnel is the only road in. The toll is charged one way only — on the way in to Whittier — so one toll covers a round trip. It is a state charge, not a harbour fee, and the city's sales tax does not apply to it.
Books are sold whole and tickets do not expire. Towing a boat trailer puts you in Class B1; a wide boat trailer (8.5–10 ft) is Class B2 and needs a permit.
A year, all in
What the published rates come to for the numbers you entered.
$564.00
Harbour fees are taxable. The 5% rate is printed on the city's own harbour paperwork — the grid use agreement states "NOTE: Tax of 5%", and the wait-list form says the fee is "$50 plus tax". A total without it would be short.
This is not a quote
Pick the one that matches how you actually use the harbour. Reserved moorage is billed for the calendar year, not prorated by season.
| What it is | 2026 rate | 2025 rate |
|---|---|---|
| Reserved (preferential) moorageper ft, a yearJan 1 – Dec 31. This is the permanent-berth product, and it is the one with a wait list. | $84.46 | $80.59up 4.8% |
| Transient moorage, summer monthlyper ft, a month | $19.25 | $18.37up 4.8% |
| Transient moorage, summer dailyper ft, a day | $1.34 | $1.28up 4.7% |
| Transient moorage, winter seasonper ft, a seasonOct 1 – Mar 31, charged once for the whole season. | $56.62 | $54.02up 4.8% |
| Winter dry storageper ft, a month | $4.80 | $4.58up 4.8% |
Worked out from the published prices alone: how many it takes before paying once beats paying each time. Where something is sold in a book, the price of one use is the book’s price shared across the uses it covers.
We can’t tell you whether a berth is free
Reserved berths are full and the city keeps a wait list. There is a separate list for each size band, and you pay to hold a place on each one you join. You do not need to own a boat to join.
$50.00 $50 a year plus tax, per list. Renewal forms go out by post and must be paid by 31 December — the city's own application says there are no exceptions to that rule. Boats over 60 ft join at no charge.
During the summer season the city does not allow vehicles with trailers, or trailers on their own, in the harbour parking lot — they go to the chamber of commerce lots instead. If you trailer a boat in, the truck-and-trailer parking rate above only applies where there is space outside that restriction.
The fee schedule still lists an annual transient moorage rate, marked "No Longer Offered". If someone quotes it to you, it is not a product you can buy. Reserved (preferential) moorage is the annual berth.
The pass is the best-known way to buy the toll, but against the 30-ticket book it does not pay for itself until about 74 round trips a year in Class A, or 60 towing a trailer. Against single tickets it needs about 47 and 45. The calculator above works this out for the number of trips you actually make.
The schedule also prices things you pay only when they happen: the grid at $2.90 per foot per tide, a hoist at $23.91 per half hour, bilge pump-out at $75 an hour, emergency snow removal at $250, a shower at $5.00, and a $0.25 environmental fee per transaction. Freight and raw fish across the city docks are charged by weight.
Whittier Harbormaster
VHF: 16, working 68
Source: 2025 – 2026 Fee Schedule, City of Whittier, checked August 5, 2026 (today).
For a boat you trailer in rather than berth. The ramp fee is per round trip.
Town Tools builds free, public tools for Whittier and towns around the world. A team of agents researches each place from local sources and keeps the tools up to date; residents suggest new ones and report corrections.
| What you buy | |
|---|---|
| Pay per launchRound trip, recreational or commercial fishing. | $25.00 |
| Annual launch permit | $160.00One price, however many |
Daily rates run midnight to midnight, paid at the kiosk or the Passport app. Trailers are a separate rate — and see the notice below about summer.
| What you buy | Single vehicle up to 24 ft | Truck and trailer |
|---|---|---|
| Pay per day | $11.00 | $22.00 |
| Annual parking permitOne vehicle, Jan 1 – Dec 31. | $250.00One price, however many | $250.00One price, however many |
Only if you use shore power at the small-boat harbour. The DeLong Dock is a different, higher tariff.
| What it is | 2026 rate | 2025 rate |
|---|---|---|
| Electricity usedper kWh | $0.21 | $0.20up 5% |
| Monthly electric service chargea monthCharged only when the service is actually used. | $14.50 | $13.83up 4.8% |
The Anton Anderson tunnel is the only road in. The toll is charged one way only — on the way in to Whittier — so one toll covers a round trip. It is a state charge, not a harbour fee, and the city's sales tax does not apply to it.
| What you buy | Class A — car or motorcycle, no trailer | Class B1 — vehicle pulling a trailer |
|---|---|---|
| Single ticket | $13.00 | $22.00 |
| Book of 10 | $110.00$11.00 each | $192.50$19.25 each |
| Book of 30 | $247.50$8.25 each | $495.00$16.50 each |
| Seasonal passWinter runs Oct 1 – Apr 30, summer May 1 – Sep 30, so a pass covers one of the two, not the year. | $605.00One price, however many | $990.00One price, however many |
Books are sold whole and tickets do not expire. Towing a boat trailer puts you in Class B1; a wide boat trailer (8.5–10 ft) is Class B2 and needs a permit.
Source: Alaska DOT&PF — Anton Anderson Memorial Tunnel tolls (rates set 1 July 2015), checked August 5, 2026 (today).