Put in the cubic metres from your bill to see where the money goes — and where the next threshold is, because your monthly total picks one price and every cubic metre is charged at it.
Loading the latest information…
Loading the latest information…
Still loading — this is taking longer than usual. There’s no need to reload.
This still hasn’t loaded. It looks stuck rather than slow, so reloading is worth a try now.
Town Tools builds free, public tools for Lloydminster and towns around the world. AI researches each place from local sources and keeps the tools up to date; residents suggest new ones and report corrections.
From Town Tools. For the current version, visit https://www.towntools.org/lloydminster-alberta-ca/water-and-waste-bill
cubic metres (m³)
Your bill shows the month's consumption in cubic metres, from your meter reading. One cubic metre is 1,000 litres.
What a cubic metre costs
How much
Water
a total up to 30 m³
$4.64
a total of 30–70 m³
$4.85
a total above 70 m³
$4.94
Your total for the period picks one rate, and every unit is then charged at it — not just the ones above the boundary.
Your estimated monthly bill
At 2026 rates, October to December rates
$117.56
a month
Water
$75.52
Stormwater (developed lot up to 2,000 m²)
$18.68
Curbside collection, with the recycling rebate to 31 December 2026
$16.60
Landfill services
$6.76
Total
$117.56
At 30 m³ the usage charge is $139.20. One more unit and the whole period re-prices: $150.35, which is $11.15 more.
Water includes the monthly base charge, your metered usage, any per-meter fees and sales tax.
One bill covers water, wastewater, stormwater and the bins, and the City sets every line in its Fees and Charges Bylaw.
An estimate, not your bill
This is a guide, not your actual bill. Real bills depend on your meter size, your exact metered use, and any adjustments or programs you qualify for. Check your bill, or ask whoever bills you, for the exact figures.
Why the bills keep rising
Why one cubic metre can cost $11
Most tiered water rates charge each tier only for the water inside it. Lloydminster's do not. The City's own wording is that "any billing period with consumption in excess of the below amounts will be billed at the higher rate on all consumption in the period" — so a month of 31 m³ is 31 × $4.85, not 30 × $4.64 plus one at $4.85. The cubic metre that takes you past 30 therefore costs $11.15: $4.85 for the water, and $6.30 because every earlier cubic metre is re-priced with it. Nothing on the bill says so.
The City published six worked bills in its draft 2027 budget on 4 November 2026 — three households and three businesses. This page's arithmetic reproduces all six, including the two above 30 m³ that only the whole-period rate explains: 80 m³ on a 1" meter comes to $494, and the ordinary tier-by-tier sum would have said $481.
The monthly distribution charge per meter size in 2026: 5⁄8 inch, $24.48; 3⁄4 inch, $36.72; 1 inch, $61.20; 1½ inch, $146.88; 2 inch, $244.80; 3 inch, $563.05; 4 inch, $1,003.71; 6 inch, $2,252.19. Those are the only sizes the bylaw lists. The consumption rates are the same whatever the meter.
Monthly stormwater for a developed lot in 2026, by lot size: up to 2,000 m², $18.68; 2,001 to 7,000 m², $37.36; 7,001 to 12,000 m², $164.34; 12,001 to 17,000 m², $246.51; 17,001 to 22,000 m², $328.68; 22,001 to 30,000 m², $410.85; above 30,000 m², $606.78. A vacant or undeveloped lot pays a quarter of its band. A duplex counts as one property; a semi-detached house counts as one property but the fee is charged for each dwelling, so a semi with a single utility account is billed twice.
The $20.42 curbside fee and the $6.76 landfill fee are charged to residential accounts that get curbside collection — single detached, semi-detached and duplex homes. The City does not collect from multi-family or commercial properties, so those accounts carry neither fee and arrange their own collection. Residential recycling moved to Alberta's Extended Producer Responsibility programme on 1 October 2026; garbage and organics are still the City's.
Two things, and only one of them has a number yet. The $3.82 recycling rebate stops on 31 December 2026. The City has said the curbside fee itself will come down once residential recycling is out of it, and its draft budget shows a 9% fall in the waste and recycling line — but no 2027 figure has been set: the column in Bylaw 20-2025 was written before the recycling change and is marked subject to change. The water, stormwater and landfill rates for 2027 are in the same bylaw with the same caveat. This page will be re-checked when Council sets them.
The bylaw writes the bands as 0–30, 30–70 and 70+, so 30 and 70 each appear twice. The City's own page resolves 30 in the reader's favour — "consumption up to 30 m³" is charged at $4.64 — and the rule as the utility bylaw states it is that a bill showing consumption "over" a threshold goes to the higher rate, so this page charges a month of exactly 30 m³ at $4.64 and exactly 70 m³ at $4.85. A bill landing precisely on a boundary is worth checking against the City.
Water, wastewater, stormwater and the bins are run by the City under the Lloydminster Charter, and the Fees and Charges Bylaw has no Alberta or Saskatchewan column. Your side of the border does not change this bill. None of these charges carry GST.