Town Tools builds free, public tools for Toronto and towns around the world. AI researches each place from local sources and keeps the tools up to date; residents suggest new ones and report corrections.
From Town Tools. For the current version, visit https://www.towntools.org/toronto-ontario-ca/ttc-line-status
Which TTC lines are open right now? Live service alerts for the subway and LRT, straight from the TTC's official feed, layered on each line's standing status.
Service alerts on Line 1 Yonge–University
The details are below (checked Nov 26, 8:54 a.m.).
Line 1 Yonge–University
SubwayService alert
Open. The TTC has been removing slow zones between Sheppard West and St George, and says there are no planned subway or LRT closures until the end of June 2026, deliberately, for the World Cup.
Reduced service: Line 1 Yonge-University: There will be no subway service between College and Osgoode stations, starting 11:59 p.m., on Friday, November 27, due to planned track work. Shuttle buses will operate.
Until Nov 27, 11:59 p.m.
Reduced service: Line 1 Yonge-University: There will be no subway service between Bloor-Yonge and Osgoode stations, starting 11:59 p.m., nightly Monday, November 23 to Thursday, November 26, due to planned track work. Shuttle buses will operate.
Until Nov 26, 11:59 p.m.
Planned — Stops out of service: Line 1 Yonge-University: There is no subway service between College and Osgoode stations due to planned track work. Shuttle buses are running.
From Nov 27, 11:59 p.m. to Nov 28, 3:30 a.m.
Planned — Stops out of service: Line 1 Yonge-University: There is no subway service between Bloor-Yonge and Osgoode stations due to planned track work. Shuttle buses are running.
From Nov 26, 11:59 p.m. to Nov 27, 3:30 a.m.
Line 2 Bloor–Danforth
SubwayOpen
Open. Its trains turn 30 this year — a $2.3-billion order for 70 new trains was placed in January 2026 (55 of them for Line 2), with deliveries starting around 2030.
Line 3 Scarborough
SubwayClosed
Closed permanently since July 2023. Replacement buses run along the corridor; a dedicated busway on the old route is scheduled to open by the end of September 2026.
Open since February 8, 2026 — Mount Dennis to Kennedy. Signal priority added since March 2026 has cut afternoon-peak round trips by up to 10 minutes, with more signal work rolling out through 2026.
Alerts checked Nov 26, 8:54 a.m.. Live data: TTC subway and LRT alerts (GTFS-Realtime, City of Toronto Open Data Portal) (dataset). Contains information licensed under the Open Government Licence – Toronto. Official alerts: TTC service advisories.