Common Questions
Water supply, health care after the Kilembe hospital closure, the mine and cement plant, markets, the border and the equator — answered plainly, with sources and dates.
Plain answers to the questions that come up in Kasese beyond the river — water, health care, the mine, the markets — each with its source and the date we checked it.
Why do the taps keep drying up?
Kasese's piped water comes from the Kilembe valley — the same valley the floods batter — and supply has repeatedly failed in parts of town. In 2024, residents of Kizungu, Kanyangeya and Nyakasanga West reported trekking for water and fetching from streams and roadside drainage channels, with tap operators raising a jerrycan from UGX 100 to between 300 and 500 (Daily Monitor, 2024; The Independent). Some residents drew water from the Nyamwamba itself.
Water from the river and from drainage channels is not safe to drink without boiling or treating — during the same shortages it carries whatever the floods and the channels carry. The council's projected piped coverage is 75.7% (kasesemc.go.ug).
Kilembe Mines Hospital closed — where do I go now?
For anything urgent, Rukoki Community Hospital just north of town — accredited as a public hospital in July 2025, when it was renamed from Rukoki Health Centre IV — is the closest place that can admit, operate and transfuse. Mt. St. Mary's and Kasese Hospital are also in town, and St. Paul's Health Centre IV at Kamaiba has a theatre.
Kilembe Mines Hospital itself has moved twice. After the May 2020 floods submerged it, its services ran from diocesan buildings in Kasese town — the former St. Michael Kindergarten and the Kasese Catholic Social Services Hall — and by 2023 they had moved back up the valley to a former recreation centre on raised ground opposite the old site in Bulembia (Daily Monitor, May 2020; The Observer). In February 2023 government instructed that financial assistance to the hospital cease and over 80 staff were redistributed to facilities in the municipality, so its services have been on and off since; the health minister has said it will be reinstated once the hospital is revamped and the River Nyamwamba desilting project is complete. Confirm it is open before travelling.
For up-valley residents this still means coming down to town for care that used to be next door — and when the river takes the Kilembe road, Bugoye Health Centre IV up the valley is the nearest centre that can operate. In an emergency, 999 or 112 reaches police, fire and ambulance services.
Is the Kilembe mine really reopening?
A deal exists, rehabilitation is under way, and mining is now expected to start in 2027. The government signed its first mineral production-sharing agreement in March 2025 with a consortium led by Sarrai Group — reported at more than US$230 million, targeting copper cathodes and cobalt, with the state mining company UNMC holding 15% — and handed over the mine's assets to Sarrai Group and Nile Fibreboard under a concession reported at 21 years. In October 2026 Kasese Municipality mayor Chance Kahindo put the start of mining in 2027, conditional on rehabilitation works and other preparations being finished (Nile Post, 16 October 2026; Directorate of Geological Survey and Mines).
On jobs, the honest picture has got clearer and it is mixed. The Uganda National Mining Company's director, Alex Akwatampora, said in the same reporting that the sector has not developed enough to produce a large pool of skilled people, that some specialised roles may need training or recruitment from abroad, and that modern methods mean a workforce smaller than the roughly 6,000 the mine employed at its peak. No public recruitment process had been announced when we checked. Treat any job offer that asks you for money as fraud — wait for announcements through official channels and the radio.
The government has also moved to reclaim Kilembe Mines land ahead of redevelopment, which affects people settled on it.
Who owns Hima Cement now?
Sarrai Group — the same Ugandan group behind the Kilembe redevelopment. It completed the purchase of Hima Cement from the Swiss Holcim group's companies in March 2024, with Rwimi Holdings taking the minority stake (Uganda Business News; completion reported March 2024). The Hima plant, about 24 km north of town, continues to run on the district's limestone.
Where are the markets?
The municipality lists 8 open public markets, selling mainly agricultural produce (kasesemc.go.ug) — Shauriyako market in the town wetland area is among the best known. A published schedule of market days was not available online when we checked; the division offices and the council (+256 787 885452) can say which market runs which day. If a reliable schedule surfaces, it belongs on this page.
What should I know about the Mpondwe border?
Mpondwe, about 40 km southwest of town, is the busiest Uganda–DRC crossing by trade volume (Wikipedia), and Kasese town is the staging market for that trade. Cross-border traders need the usual documents — for current border requirements and any security advisories, check with authorities before travelling rather than relying on a static page.
Where is the equator landmark?
At Kikorongo, on the Kasese–Mbarara road inside Queen Elizabeth National Park, about 20 km south of town. The colonial-era monument was dismantled in 2019 for road works; a new monument with a globe crossed by the equator line replaced it and has become a stop for travellers and a boost for Kikorongo traders (Daily Monitor; New Vision).
How is the municipality organised?
Three divisions: Central (48,608 people), Nyamwamba (70,909) and Bulembia (14,112), by the 2024 census — 19 parishes and 58 villages in all, with about 133,600 people. Bulembia runs up the valley toward Kilembe. The municipal council's contact is +256 787 885452, P.O. Box 54, Kasese (kasesemc.go.ug). Kasese town is also the seat of the Obusinga Bwa Rwenzururu cultural institution.
About these tools
Town Tools builds free, public tools for Kasese and towns around the world. AI researches each place from local sources and keeps the tools up to date; residents suggest new ones and report corrections.